赤道几内亚Mbini大桥项目

发布时间:2012/11/16    点击量:2940

 

赤道几内亚Mbini大桥项目

Mbini Bridge in Equatorial Guinea

 

    横跨Wele河南北两岸,全 长1698m,属于独塔双索面预应力混凝土斜拉桥。大桥由主桥、引桥及引道组成。桥梁总长1057m,宽13m,主塔高81.447m。合同额4,495 万欧元。2010年1月1日开工,工期33个月。建成之后是赤道几内亚及中西非地区第一座斜拉桥。

     The bridge crosses over the southern and northern banks of the Wele River with the total length of 1698m. It is a single-tower, double cable plane, prestressed concrete cable-stayed bridge which consists of main bridge, approach and approach road. The main bridge is 1057m long, the bridge deck is 13m wide, the height of the main tower is 81.447m. Commenced in Jan, 2010, the total contract period is 33 months. It will be the first cable-stayed bridge in Equatorial Guinea, even in the Central and West Africa.