赤道几内亚Mbini大桥项目

发布时间:2014/11/20    点击量:10417

赤道几内亚Mbini大桥项目

Mbini Bridge in Equatorial Guinea

 

工程位于赤道几内亚Bata市至Mbini市公路跨Wele河,全长1698米,属于独塔双索面预应力混凝土斜拉桥,是赤道几内亚及中西非地区第一座斜拉桥,也是赤到几内亚几的标志性建筑。大桥由主桥、引桥及引道组成。桥梁总长1057m,宽13m,主塔高81.447m。合同额4602万欧元。2010年1月1日开工,工期33个月。已于2012年8月提前竣工通车。

 The bridge located between Bata City and Mbini City, crosses over the southern and northern banks of the Wele River with the total length of 1698m. It is a single-tower, double cable plane, prestressed concrete cable-stayed bridge which consists of main bridge, approach and approach road. The Bridge is not only the symbolic structure of Equatorial Guinea, but also the unique cable-stayed bridge even in West and Central Africa. The main bridge is 1057m long, the bridge deck is 13m wide, the height of the main tower is 81.447m, and the contract amount is 46,020,000EUR.Commenced in Jan, 2010, the total contract period is 33 months. On August 2012, the project has been completed in advance and come into service.