Kenya Mombasa-Nairobi Gauge Railway

肯尼亚蒙内标轨铁路

 

      

中国路桥蒙内标轨铁路第八标段线路长度为11.65km,主要工程内容包含路基工程(含路基土石方和路基附属),桥涵工程,底碴铺设,车站站房,站场工程(含站场路基、站场道路和站场构筑物)及管线迁改等工程项目。其中框架涵3座,特大桥1座,车站站房三处,蒙巴萨港口站、蒙巴萨西站和内罗毕南站;车站站场一处,内罗毕南站。该项目将于2014年10月20日开工,于2017年4月30日竣工。

The length of Section 8 of China Road and Bridge Mombasa-Nairobi Standard Gauge Railway is 11.65km. The main project contains subgrade engineering (including subgrade earthworks and roadbed subsidiary), brides and culverts, sub ballast laying, station buildings, station project (including roadbed, road and building of the station) and the demolition of pipeline and wire. There are three frame culverts, one outsize bridge, and three stations building including Mombasa Port Station, West Station of Mombasa and South Station of Nairobi and one station yard named South Station of Nairobi. The project will be commenced on October 20, 2014, and be completed on April 30, 2017.